S. 4529 · 119th Congress · Energy

Build Nuclear with Local Materials Act of 2026

Authorizes use of locally-sourced materials in nuclear power plant construction. AI-read

In committee162 words Introduced May 14, 2026 · Latest action May 20, 2026

How far it has goneStage 2 of 6
  1. IntroducedMay 14, 2026 Done
  2. CommitteeReferred to Environment and Public Works Current stage
  3. Senate floorNot yet Not reached yet
  4. House floorNot yet Not reached yet
  5. Chambers agreeNot yet Not reached yet
  6. PresidentNot yet Not reached yet
Next scheduledNo committee meeting is scheduled for this bill. Last: hearing held May 20, 2026 · Environment and Public Works, Subcommittee on Clean Air, Climate, and Nuclear Innovation and Safety

Add these meetings to your calendar

Full text

No CRS summary yet · 162 words

S. 4529 · Introduced in Senate · May 14, 2026

SECTION 1. SHORT TITLE.

This Act may be cited as the Build Nuclear with Local Materials Act of 2026 .

SEC. 2. USE OF COMMERCIAL-GRADE STEEL AND CONCRETE.

(a) In general. Not later than 90 days after the date of enactment of this Act, the Nuclear Regulatory Commission (referred to in this section as the Commission ) shall initiate a rulemaking that authorizes the use of commercial-grade steel and concrete in non-safety-related structures at nuclear power plants, unless, subject to subsection (b), the Commission determines that stricter material standards are necessary to address a specific safety risk.

(b) Determination. The Commission may make a determination under subsection (a) that stricter material standards are necessary to address a specific safety risk if the Commission determines that not using a stricter material standard would be contrary to the common defense and security and adequate protection of the public health and safety (within the meaning of section 182 a. of the Atomic Energy Act of 1954 ( 42 U.S.C. 2232(a) )).

Shown here because the text is under 500 words. Open on Congress.gov

Who lobbies on it

1 organization · 2 filings · Q2 2026–Q3 2026

See which of this bill’s sponsors and cosponsors got money from Nuclear Energy Institute, Inc’s PAC → Pro

One square per quarter since introduction, oldest left. Filled = named S. 4529 or H.R. 8812 that quarter.

  1. Nuclear Energy Institute, Inc 2 of 2 quarters
    “…H.R.8812 - Build Nuclear with Local Materials Act: To require the Nuclear Regulatory Commission to allow the use of commercial-grade steel and concrete in non-safety-related structures at nuclear power plants, and for other purposes. S.4529 - Build Nuclear with Local Materials Act: To require the Nuclear Regulatory…”

    $1.6M lobbying spend in 2026 to date, all issuesQ3 2026 filing · names both

Organizations that named S. 4529 or its companion H.R. 8812 in a quarterly lobbying report. Covers organizations with a PAC on file; reports from organizations without one aren’t loaded yet. Spend is the organization’s total across all issues: reports don’t split spending by bill. Reports naming only H.R. 8812 are included and tagged. “Gave to” means the organization’s PAC gave to the member’s campaign in the 2025–26 cycle, net of refunds; it doesn’t mean the money was about this bill. Members sponsoring the companion, H.R. 8812, are counted on that bill’s page, not here. Organizations may lobby for, against, or to change a bill; filings don’t say which. Source: Senate lobbying disclosures (LD-2) from lda.gov; PAC gifts from FEC filings; quotes are word for word from the “specific lobbying issues” field; where a filing lists many bills, the quote starts where it names this one.

Actions

3 actions · newest first
  1. May 20, 2026Committee on Environment and Public Works Subcommittee on Clean Air, Climate, and Nuclear Innovation and Safety. Hearings held.
  2. May 14, 2026Read twice and referred to the Committee on Environment and Public Works.
  3. May 14, 2026Introduced in Senate