H.R. 4833 · 119th Congress · Armed Forces and National Security

Dyess Air Base Access Infrastructure Design Act

In committee260 words Introduced Aug 1, 2025 · Latest action Aug 1, 2025

How far it has goneStage 2 of 6
  1. IntroducedAug 1, 2025 Done
  2. CommitteeReferred to Armed Services Current stage
  3. House floorNot yet Not reached yet
  4. Senate floorNot yet Not reached yet
  5. Chambers agreeNot yet Not reached yet
  6. PresidentNot yet Not reached yet

Full text

No CRS summary yet · 260 words

H.R. 4833 · Introduced in House · Aug 1, 2025

SECTION 1. SHORT TITLE.

This Act may be cited as the Dyess Air Base Access Infrastructure Design Act .

SEC. 2. PLANNING AND DESIGN ACTIVITIES FOR INFRASTRUCTURE PROJECTS AT DYESS AIR FORCE BASE, TEXAS.

(a) Tye Gate design. (1) In general The Secretary of the Air Force shall carry out planning and design activities for an infrastructure project relating to the Tye Gate at Dyess Air Force Base, Texas. (2) Amount of project The infrastructure project for which planning and design activities are required under paragraph (1) shall be for an amount not to exceed $17,000,000, of which planning and design may not exceed seven percent. (3) Design activities Design activities required under paragraph (1) may be based on standard Air Force gate designs and shall consider minimal utility crossings, limited conflicts with built infrastructure, and simplified phasing.

(b) Arnold Gate design. (1) In general The Secretary shall carry out planning and design activities for an infrastructure project relating to the Arnold Gate at Dyess Air Force Base, Texas. (2) Amount of project The infrastructure project for which planning and design activities are required under paragraph (1) shall be for an amount not to exceed $12,065,000, of which planning and design may not exceed eight percent. (3) Design activities Design activities required under paragraph (1) shall account for site congestion, multiple utility connections, phased construction, and complex traffic coordination.

(c) Use of existing amounts. The requirements under this section shall be carried out using amounts otherwise made available to the Department of the Air Force for planning and design under military construction accounts.

Shown here because the text is under 500 words. Open on Congress.gov

Who lobbies on it

No lobbying filing on file names H.R. 4833 or its companion S. 2105.

Organizations that named H.R. 4833 or its companion S. 2105 in a quarterly lobbying report. Covers organizations with a PAC on file; reports from organizations without one aren’t loaded yet. Spend is the organization’s total across all issues: reports don’t split spending by bill. Reports naming only S. 2105 are included and tagged. Source: Senate lobbying disclosures (LD-2) from lda.gov; quotes are word for word from the “specific lobbying issues” field; where a filing lists many bills, the quote starts where it names this one.

Actions

2 actions · newest first
  1. Aug 1, 2025Referred to the House Committee on Armed Services.
  2. Aug 1, 2025Introduced in House