H.R. 10918 · 119th Congress
Natural Gas Dominance Act
- IntroducedOct 29, 2026 Done
- CommitteeReferred to Energy and Commerce Current stage
- House floorNot yet Not reached yet
- Senate floorNot yet Not reached yet
- Chambers agreeNot yet Not reached yet
- PresidentNot yet Not reached yet
Full text
No CRS summary yet · 486 wordsH.R. 10918 · Introduced in House · Oct 29, 2026
This Act may be cited as the Natural Gas Dominance Act .
(a) Standards of performance for new stationary sources. Section 111 of the Clean Air Act ( 42 U.S.C. 7411 ) is amended by adding at the end the following: (k) Crude oil and natural gas facilities (1) Prohibition on requiring continuous NHV monitoring In carrying out this section, the Administrator may not require the owner or operator of a crude oil and natural gas facility to continuously monitor the net heating value (or a related parameter) of a combustion control device, including a flare and enclosed combustion device. (2) Net heating value defined In this subsection, the term net heating value means NHV cz or NHV dil (as each such term is defined in section 63.670(m) of title 40, Code of Federal Regulations (as in effect on the date of enactment of this subsection)). .
(b) Hazardous air pollutants. Section 112(n)(4) of the Clean Air Act ( 42 U.S.C. 7412(n)(4) ) is amended by adding at the end the following: (C) Prohibition on requiring continuous NHV monitoring (i) In general In carrying out this section, the Administrator may not require the owner or operator of an oil and gas exploration or production well or a natural gas transmission and storage facility to continuously monitor the net heating value (or a related parameter) of a combustion control device, including a flare and enclosed combustion device. (ii) Net heating value defined In this subsection, the term net heating value means NHV cz or NHV dil (as each such term is defined in section 63.670(m) of title 40, Code of Federal Regulations (as in effect on the date of enactment of this subparagraph)). .
(a) Prohibition on reducing maximum allowed duration during malfunctions or safety incidents. The Administrator of the Environmental Protection Agency may not promulgate a rule that reduces, to a number of hours below 72 hours, the maximum number of hours that an owner or operator of a well that is complying with paragraph (a) of section 60.5391c, or paragraph (a) of section 60.5377b, of title 40, Code of Federal Regulations (or any successor regulations), may temporarily route associated gas to a flare or control device during a malfunction or incident that endangers the safety of operator personnel or the public.
(b) Allowed duration during service interruptions. The owner or operator of a well complying with paragraph (a)(1) of section 60.5391c, or paragraph (a)(1) of section 60.5377b, of title 40, Code of Federal Regulations (or any successor regulations), may route associated gas to a flare or control device for the duration of a temporary interruption in service from the gathering or pipeline system, or an amount of time that the Administrator of the Environmental Protection Agency determines to be necessary that is no less than 90 days, whichever is less.
Shown here because the text is under 500 words. Open on Congress.gov
Who lobbies on it
No lobbying filing on file names H.R. 10918.
Organizations that named H.R. 10918 in a quarterly lobbying report. Covers organizations with a PAC on file; reports from organizations without one aren’t loaded yet. Spend is the organization’s total across all issues: reports don’t split spending by bill. Source: Senate lobbying disclosures (LD-2) from lda.gov; quotes are word for word from the “specific lobbying issues” field.
Actions
2 actions · newest first- Oct 29, 2026Referred to the House Committee on Energy and Commerce.
- Oct 29, 2026Introduced in House